Butler Street Boat Ramp
Dock and Facility Improvements

Lake County (Astor), Florida

Butler Street Boat Ramp and Dock

Client

Lake County, Florida

Location

Astor, Florida

Related Services

Dock and Facility Improvements

Madrid CPWG was engaged by Lake County to provide design and permitting services for enhancements to the Butler Street Boat Ramp and parking area. The goal of the project was to improve the existing parking lot through a combination of resurfacing the old lot and extending the lot by creating new parking to the west.

Official’s efforts to construct a boat ramp in Asatula, Florida. Madrid CPWG Engineers prepared construction documents associated with the floating dock, parking area, and restroom facility. 60%, 90%, 100%, and final construction documents were submitted to the County for review and comment. Madrid CPWG attended two design review meetings with County staff. The final plan was provided to County staff for submittal of required County building permits or health department permits. Madrid CPWG submitted the Environmental Resource Permit (ERP) documents to the St. Johns River Water Management District for permit/exemption request.

The MADRID CPWG design for the boat ramp area included:

  • Upgraded the floating dock
  • Resurfaced boat ramp
  • Restriped the boat ramp area
  • Replaced fence along the approach
  • All new signs
  • Provided location for a prefabricated waterless restroom.

The MADRID CPWG design for the parking area included:

  • Asphalt overlay on existing pavement
  • Added paved trailer parking (40-ft in length)
  • Restriped the boat ramp area
  • Restriped the entire parking area
  • Painted and reused wheel stops in good condition
  • All new signs
NPDES Basin Survey, Madeira Beach, Florida
The Madrid CPWG team’s design addressed ADA issues including truncated domes, pedestrian signs, restriping crosswalk, etc)